User contributions
Jump to navigation
Jump to search
- 20:47, 21 September 2007 diff hist +690 Talk:Dimmers & Switchbanks
- 20:35, 21 September 2007 diff hist -13,502 m Talk:Networking Reverted edits by 211.136.105.86 (Talk); changed back to last version by John Rumm
- 13:42, 21 September 2007 diff hist +2,498 Talk:Dimmers & Switchbanks The Stanley Unwin school...
- 03:16, 21 September 2007 diff hist 0 Dimmers & Switchbanks →Wiring for switchbanks: typo
- 17:50, 20 September 2007 diff hist +349 Terminating SWA →Step 6 - Connecting to your box: more on bajo tags and their use
- 14:32, 20 September 2007 diff hist +2,202 Terminating SWA Added Andy W's comments
- 01:53, 20 September 2007 diff hist +146 N Talk:Low voltage wiring
- 01:50, 20 September 2007 diff hist +293 Low voltage wiring added a bit of extra intro to explain terminology
- 01:40, 20 September 2007 diff hist -286 Terminating SWA took under construction header off since most comments are now included
- 01:36, 20 September 2007 diff hist +996 Terminating SWA Merged the stripping out and armour sections and better described the hacksaw approach
- 13:36, 19 September 2007 diff hist +634 Talk:Terminating SWA
- 01:09, 19 September 2007 diff hist +719 Talk:Terminating SWA
- 01:00, 19 September 2007 diff hist -18 Terminating SWA Gone back to previous version, since I have now uploaded a set of optomised images under the old names
- 00:36, 19 September 2007 diff hist +1 m Talk:Terminating SWA
- 00:36, 19 September 2007 diff hist +169 N Talk:Terminating SWA
- 00:31, 19 September 2007 diff hist +7,380 m Domestic Hot Water Systems Reverted edits by 195.8.168.252 (Talk); changed back to last version by John Rumm
- 22:53, 18 September 2007 diff hist +169 Terminating SWA →Step 1 - Assemble the gland parts on the wire: added note on conical ring fittings
- 22:33, 18 September 2007 diff hist +20 Cables
- 22:30, 18 September 2007 diff hist +491 Terminating SWA Added section on using a hacksaw for cutting insulation and armour on larger cables.
- 20:50, 18 September 2007 diff hist +9,207 N Terminating SWA First draft
- 20:39, 18 September 2007 diff hist +13 N File:AddBoot.jpg Boot in place current
- 20:37, 18 September 2007 diff hist +31 N File:TightenLocknut.jpg Locknut and solder tag in place current
- 20:34, 18 September 2007 diff hist +22 N File:EarthWireWithEyeTerminal.jpg Terminal on earth wire current
- 20:32, 18 September 2007 diff hist +14 N File:BendSolderTag.jpg Bent gland tag current
- 20:31, 18 September 2007 diff hist +22 N File:Through20mmHole.jpg Gland in place in hole current
- 20:29, 18 September 2007 diff hist +55 N File:20mmHolesaw.jpg Small holesaw for conduit and SWA gland mounting holes. current
- 20:23, 18 September 2007 diff hist +26 N File:WaterproofingGlandInPlace.jpg Waterproofing gland fitted current
- 20:18, 18 September 2007 diff hist +40 N File:BreakInnerInsulation.jpg Stripping inner insulation - second step current
- 20:16, 18 September 2007 diff hist +39 N File:RingInsulation.jpg Stripping inner insulation - first step current
- 20:11, 18 September 2007 diff hist +17 N File:ArmourClampFixed.jpg Armour clamp done current
- 20:09, 18 September 2007 diff hist +22 N File:GripRingInPlace.jpg Fitting the gland cone current
- 20:05, 18 September 2007 diff hist +22 N File:PositionCone.jpg Fitting the gland cone current
- 20:04, 18 September 2007 diff hist +19 N File:SplayArmour.jpg Splaying SWA armour current
- 20:00, 18 September 2007 diff hist +14 N File:ArmourCut.jpg Cut SWA armour current
- 19:59, 18 September 2007 diff hist +18 N File:SnipArmourWires.jpg Cutting SWA armour current
- 19:48, 18 September 2007 diff hist +43 N File:SlideBitsOnCable.jpg Order of assembly of a gland on a SWA cable current
- 19:46, 18 September 2007 diff hist +17 N File:ChopBoot.jpg Cutting the boot. current
- 19:40, 18 September 2007 diff hist +46 N File:PartStripped4mmSWA.jpg part stripped outer sheath of SWA - last step. current
- 19:38, 18 September 2007 diff hist +47 N File:SliceDownOuter.jpg Removing the outer sheath of SWA - second step. current
- 19:36, 18 September 2007 diff hist +45 N File:RingOuter.jpg Cutting the outer sheath of SWA - first step. current
- 19:27, 18 September 2007 diff hist +24 N File:3PartSWAGland.jpg Three part SWA gland kit current
- 19:20, 18 September 2007 diff hist +15 N File:4mmSWA.jpg 4mm² SWA cable current
- 19:15, 18 September 2007 diff hist +17 N File:BigCutters.jpg 24" bolt croppers current
- 16:08, 18 September 2007 diff hist +129 Talk:Part P - Discussion That link
- 15:53, 18 September 2007 diff hist +330 Talk:Cables →LV!
- 12:37, 18 September 2007 diff hist +197 Taking electricity outside →Surface Clipped: typo, plus cable fixing tip
- 12:31, 18 September 2007 diff hist +31 Cables →SWA: Added link to outdoor electrics page
- 10:43, 18 September 2007 diff hist -17,146 m Talk:Central heating design Reverted edits by 216.127.153.145 (Talk); changed back to last version by John Rumm
- 10:43, 18 September 2007 diff hist -9,665 m Fitting TRVs to Microbore Reverted edits by 61.145.97.234 (Talk); changed back to last version by John Rumm
- 10:36, 18 September 2007 diff hist -16,971 m Talk:Networking Reverted edits by 87.101.244.10 (Talk); changed back to last version by John Rumm